How to calculate pavers
- Multiply the patio length by its width: 12 × 12 = 144 ft².
- Find the face area of one paver in square feet: 8 × 4 ÷ 144 = 0.2222 ft². That is 4.5 pavers per square foot.
- Divide the patio area by the paver area: 144 ÷ 0.2222 = 648 pavers with no waste.
- Add 10% for cuts and breakage and round up: 648 × 1.10 = 712.8, so buy 713 pavers.
- Work out the base: 144 × 6 ÷ 12 = 72 ft³ compacted. Add 20% for compaction to get 86.4 ft³, or 3.20 yd³. At 3,000 lb/yd³ that is 4.80 tons.
- Work out the bedding sand: 144 × 1 ÷ 12 = 12 ft³, or 0.44 yd³. At 2,600 lb/yd³ that is 0.58 tons.
- Measure the edge restraint: 2 × (12 + 12) = 48 ft for the full perimeter.
pavers = ceil(area ÷ (paver length × paver width ÷ 144) × (1 + waste))
base tons = area × (base depth in ÷ 12) × 1.20 ÷ 27 × 3,000 ÷ 2,000
The count ignores the joints between pavers. They are narrow, so the estimate errs slightly high. Paver sizes on the box can be nominal. If the maker's spec sheet lists pieces per square foot or the exact face size, use that. Some pavers come as multi-size kits sold by the square foot; for those, order by area: 158.4 ft² for the 12 × 12 ft patio with 10% waste.
Pavers per square foot by size
| Paver size | Face area | Per ft² | Per 100 ft² | Per 100 ft² + 10% |
|---|---|---|---|---|
| 4 × 8 in | 0.222 ft² | 4.5 | 450 | 495 |
| 6 × 6 in | 0.25 ft² | 4 | 400 | 440 |
| 6 × 9 in | 0.375 ft² | 2.67 | 267 | 294 |
| 12 × 12 in | 1 ft² | 1 | 100 | 110 |
| 16 × 16 in | 1.778 ft² | 0.56 | 56 | 62 |
| 12 × 24 in | 2 ft² | 0.5 | 50 | 55 |
Based on the nominal face size with no allowance for joints. The last column is rounded up to whole pavers.
Materials for common patio sizes
| Patio | Area | Pavers (+10%) | Base stone | Bedding sand | Edge restraint |
|---|---|---|---|---|---|
| 10 × 10 ft | 100 ft² | 495 | 3.33 tons | 0.40 tons | 40 ft |
| 12 × 12 ft | 144 ft² | 713 | 4.80 tons | 0.58 tons | 48 ft |
| 12 × 16 ft | 192 ft² | 951 | 6.40 tons | 0.77 tons | 56 ft |
| 16 × 20 ft | 320 ft² | 1,584 | 10.67 tons | 1.28 tons | 72 ft |
| 20 × 20 ft | 400 ft² | 1,980 | 13.33 tons | 1.60 tons | 80 ft |
Base at 3,000 lb/yd³ with the 20% compaction allowance, sand at 2,600 lb/yd³. Edge restraint is the full perimeter.
Base stone is the heavy part of the order: 13.33 tons for a 20 × 20 ft patio against 1.60 tons of sand. Plan where the delivery will be dumped and how you will move it to the work.
Base depth by use
The base carries the load; the pavers spread it. Common practice is 4 to 6 inches of compacted base for patios and walkways, and 8 inches or more for driveways. Soft clay, poor drainage and frost call for more. These are not code figures. Follow the paver maker's installation guide, which sets the base for its product, and adjust for your soil.
| Compacted depth | Common use | Loose stone | Weight |
|---|---|---|---|
| 4 in | Low end for patios and walkways | 2.13 yd³ | 3.20 tons |
| 6 in | High end for patios and walkways | 3.20 yd³ | 4.80 tons |
| 8 in | Common starting point for driveways | 4.27 yd³ | 6.40 tons |
Includes the 20% compaction allowance, at 3,000 lb/yd³. Common practice, not code.
Use a base that compacts: crushed stone with a mix of sizes and fines, often sold as road base, crusher run or paver base. Rounded stone such as pea gravel does not lock together and makes a poor base. Spread and compact it in layers a few inches thick rather than all at once, and slope it away from the house so water runs off. To estimate a different base stone, or a gravel path that leads to the patio, use the gravel calculator.
Why the base gets a compaction allowance
The base depth you enter is the compacted thickness. Loose stone from the truck shrinks when a plate compactor packs it down, so you need more loose stone than the finished volume. The calculator adds 20% to the base for this. Without it, the 12 × 12 ft example would call for 4.00 tons; with it, 4.80 tons. You can change the allowance in the calculator. If your supplier says their base compacts more, raise it to match.
The calculator figures base for the paver area only. Installers often run the base a little past the edges so the edge restraint sits on compacted stone. If you do, add that strip to the length and width.
Bedding sand
The pavers sit on a thin layer of sand screeded flat over the compacted base, about 1 inch as common practice. The calculator warns above 1.5 inches, because a thick sand layer lets pavers settle and rut. Fix low spots in the base with more base stone, not extra sand. Installation guides commonly call for coarse, washed concrete sand rather than fine play sand, so check the paver maker's guide. For the 12 × 12 ft example, 1 inch of sand is 0.44 yd³, or 0.58 tons at 2,600 lb/yd³. This does not include the sand swept into the joints.
Waste by pattern
Waste covers the cut pieces at the edges and a few broken pavers. How much you need depends mostly on the pattern and the outline of the patio.
| Layout | Waste | Pavers to buy |
|---|---|---|
| Straight pattern, square edges, few cuts | 5% | 681 |
| Straight pattern with some cuts | 10% | 713 |
| Herringbone, diagonal layouts, curves or circles | 15% | 746 |
Rules of thumb. A patio with many corners, steps or obstacles can need more.
A straight running-bond or stack pattern only needs cuts along the edges. Herringbone, especially at 45°, needs a cut at almost every edge paver, and curves and circles need cuts all the way round. Buy from one production run if you can, because color can vary between batches, and keep a few spares for later repairs.
Edge restraint
Pavers held only by sand creep outward over time, the joints open and the edge rows sink. An edge restraint holds the outside edge: plastic, aluminum or steel edging spiked into the base, or a concrete edge. The calculator gives the full perimeter, 48 ft for the 12 × 12 ft patio. Subtract any side that runs against a house wall, step or existing slab. With one 12 ft side against the house, you need 36 ft.
Polymeric joint sand
After the pavers are laid and compacted, sand is swept into the joints. Polymeric sand, which hardens when wetted, is made to resist washout and weeds. Its coverage depends on the joint width, the paver size and the paver thickness, so read the coverage chart on the bag for your paver and joint, then divide the 144 ft² patio area by it. The calculator does not count joint sand.
Pavers or poured concrete
A poured concrete patio is the main alternative. It goes down in one pour but needs forms, finishing and control joints, and it can crack. Pavers take longer to lay, but a cracked or sunken paver can be lifted and reset. To compare, work out the slab with the concrete calculator and price ready-mix against bags with the concrete cost calculator.
What this calculator does not include
- Odd shapes: the calculator takes a rectangle. For an L-shape, run each rectangle and add the results. For curves, get the area from the square footage calculator, enter it as the length with a width of 1 ft, and measure the edge restraint separately, because the perimeter figure will be wrong.
- Digging out: dig to the base depth plus the sand plus the paver thickness. The soil you remove takes more room in a truck than it did in the ground; the cubic yard calculator gives the volume.
- Extras: landscape or geotextile fabric, edging spikes, joint sand and compactor rental.
- The rest of the hardscape: slabs, footings, rebar and brick are in our concrete and masonry calculators.
Frequently asked questions
How many pavers do I need for a 12 × 12 patio?
A 12 × 12 ft patio needs 713 pavers of 4 × 8 in: 648 to cover 144 ft² plus 10% waste. With 6 × 6 in pavers it needs 634.
How many pavers are in a square foot?
It takes 4.5 pavers of 4 × 8 in per square foot, 4 of 6 × 6 in, 2.67 of 6 × 9 in and 1 of 12 × 12 in. Divide 144 by the paver's length times its width in inches for any other size.
How much base gravel do I need for a paver patio?
At 6 inches compacted, plan on 3.33 tons per 100 ft² (2.22 yd³ loose), including the 20% compaction allowance. A 12 × 12 ft patio needs 4.80 tons. At 4 inches it needs 3.20 tons.
How much sand do I need for pavers?
For 1 inch of bedding sand, plan on 0.31 yd³ per 100 ft², about 0.40 tons. A 12 × 12 ft patio needs 0.44 yd³ (0.58 tons). Joint sand is extra; read its coverage on the bag.
How deep do I dig for a paver patio?
Dig to the base depth plus the sand plus the paver thickness. With a 6 in base and 1 in of sand, that is 7 inches plus the paver, which the maker lists on the product. Slope the excavation the same way you want the finished patio to drain.
How many extra pavers should I buy?
Add 5% to 10% for a straight pattern and 15% for herringbone, curves or circles. For a 12 × 12 ft patio of 4 × 8 in pavers that is 681, 713 or 746 pavers.
The formula, worked example and tables on this page are generated from the same calculation engine as the calculator, which is checked by automated reference tests. Last reviewed 20 November 2026 by the Solosoft team. Results are planning estimates, not engineering or code approval. See the calculation disclaimer.