How to calculate concrete for tube forms
- Convert the diameter to feet and halve it for the radius: 12 in ÷ 24 = 0.5 ft.
- Find the area of the circle. That is also the cubic feet of concrete in each foot of tube: π × 0.5² = 0.785 ft³ per foot.
- Multiply by the concrete height in one tube: 0.785 × 4 ft = 3.142 ft³ per tube.
- Multiply by the number of tubes and add 5% waste: 3.142 × 6 × 1.05 = 19.79 ft³.
- Divide by 27 for cubic yards: 19.79 ÷ 27 = 0.73 yd³ (0.56 m³).
- For bags, divide by the bag yield and round up. An 80 lb bag makes 0.60 ft³: 19.79 ÷ 0.60 = 32.99, so you buy 33 bags. The same pour takes 44 bags of 60 lb, 53 of 50 lb or 66 of 40 lb.
volume = π × (D ÷ 2)² × height × tubes × (1 + waste)
Volume grows with the square of the diameter. A 24 in tube holds 4 times as much per foot as a 12 in tube, not twice as much. Moving up one tube size can add more concrete than it looks. Use the inside diameter of the tube, since that is the shape the concrete takes.
Waste is set to 5% because a tube holds its shape and does not bulge like a trench or a slab form. Raise it if the bottom of the hole is wider than the tube or the ground is soft.
Concrete per foot of tube
| Tube diameter | Concrete per foot | 80 lb bags per foot | 60 lb bags per foot | One 4 ft tube (80 lb) |
|---|---|---|---|---|
| 6 in * | 0.196 ft³ | 0.34 | 0.46 | 2 bags |
| 8 in | 0.349 ft³ | 0.61 | 0.81 | 3 bags |
| 10 in | 0.545 ft³ | 0.95 | 1.27 | 4 bags |
| 12 in | 0.785 ft³ | 1.37 | 1.83 | 6 bags |
| 14 in | 1.069 ft³ | 1.87 | 2.49 | 8 bags |
| 16 in | 1.396 ft³ | 2.44 | 3.26 | 10 bags |
| 18 in | 1.767 ft³ | 3.09 | 4.12 | 13 bags |
| 20 in | 2.182 ft³ | 3.82 | 5.09 | 16 bags |
| 24 in | 3.142 ft³ | 5.50 | 7.33 | 22 bags |
Bags per foot include 5% waste and are not rounded; multiply by your height and tube count, then round up. The last column is whole bags for one tube with 4 ft of concrete. * The calculator notes that tubes under 8 in are small for deck or porch footings.
A 6 in tube holds just 0.196 ft³ per foot, while a 24 in tube holds 3.14 ft³. For deck and porch piers the size is set by the load and the soil, so take it from your plans rather than from this table.
Concrete for a set of deck or porch footings
| Footings | Concrete incl. waste | 80 lb bags | 60 lb bags | Weight of 80 lb bags | Over 1 yd³ |
|---|---|---|---|---|---|
| 4 × 10 in | 0.34 yd³ (9.2 ft³) | 16 | 21 | 1,280 lb | No |
| 4 × 12 in | 0.49 yd³ (13.2 ft³) | 22 | 30 | 1,760 lb | No |
| 4 × 16 in | 0.87 yd³ (23.5 ft³) | 40 | 53 | 3,200 lb | No |
| 6 × 10 in | 0.51 yd³ (13.7 ft³) | 23 | 31 | 1,840 lb | No |
| 6 × 12 in | 0.73 yd³ (19.8 ft³) | 33 | 44 | 2,640 lb | No |
| 6 × 16 in | 1.30 yd³ (35.2 ft³) | 59 | 79 | 4,720 lb | Yes |
| 9 × 10 in | 0.76 yd³ (20.6 ft³) | 35 | 46 | 2,800 lb | No |
| 9 × 12 in | 1.10 yd³ (29.7 ft³) | 50 | 66 | 4,000 lb | Yes |
| 9 × 16 in | 1.95 yd³ (52.8 ft³) | 88 | 118 | 7,040 lb | Yes |
Includes 5% waste. Bag counts are rounded up for the whole set. Footing pads or flared bases under the tubes are not included.
Measure the full height of concrete
Enter the whole column of concrete in each tube: the part in the ground plus the part that sticks up above grade. A tube set 42 in into the ground with its top 6 in above the soil holds 4 ft of concrete. If you entered only the buried 3.5 ft for the six default tubes, you would buy 29 bags instead of 33 and run short on the last tube.
Footing pads, flared bases and frost depth
- Pads and flared bases: many deck plans put a wider footing pad under each tube, or use a bell-shaped plastic base that the tube sits in. Neither is included here. Work out a square or rectangular pad with the footing shape in the concrete calculator and add it to this total. For a flared base, use the volume its maker lists.
- Frost depth: the International Residential Code requires footings to be protected from frost, which usually means the bottom of the footing sits below the local frost line. Your building department sets that depth, and it varies a lot by region.
- Plans and engineering: the tube diameter, footing size, depth and any steel come from your plans, the span tables your local code uses or an engineer. If the plans call for vertical bars in each pier, size them with the rebar calculator.
- Before you dig: in the US, call 811 a few days ahead so buried utility lines are marked.
Bags or ready-mix
One cubic yard is 27 ft³, which is 45 bags of 80 lb concrete weighing 3,600 lb. The default six tubes need 33 bags, about 2,640 lb. That is a lot of lifting, but a wheelbarrow or a small rental mixer handles it, and bags let you fill one tube at a time. Over 1 yd³ the calculator suggests pricing a ready-mix delivery; in the table above that applies to 6 × 16 in, 9 × 12 in and 9 × 16 in. Small loads often carry a short-load fee, so ask your supplier and compare both with the concrete cost calculator. With ready-mix, have every tube braced and ready before the truck arrives.
Cutting and setting the tubes
- Cut to length: cut each tube so its top lands at the height on your plans. Wrap a strip of tape around the tube as a guide and cut with a handsaw or reciprocating saw. Measure the cut tube plus any gap down to the bottom of the hole, and use that as the height.
- Brace and backfill: set the tube plumb, brace it so it cannot float or lean, and backfill around it before you pour. Concrete poured into an unsupported tube can push it out of line.
- Fill in layers: place the concrete in lifts and rod it or tap the sides of the tube to work out air pockets. Set any post base or anchor bolt while the concrete is still wet.
- Strip the top: cardboard above grade weathers badly, so many builders peel off the exposed part once the concrete has cured. Follow the tube maker's directions.
Related jobs
- Fence or deck posts set straight into dug holes with no tube: use the post hole concrete calculator, which subtracts the post and the gravel.
- Decking boards, joists and screws for the deck above: use the deck calculator.
- Slabs, walls, steps and every other pour: see the concrete and masonry calculators.
Frequently asked questions
How many bags of concrete for a 12 inch Sonotube?
A 12 in tube takes about 1.37 bags of 80 lb concrete per foot, including 5% waste. One tube with 4 ft of concrete needs 6 bags of 80 lb mix; six of them need 33 bags.
How many bags of concrete for an 8 inch Sonotube?
An 8 in tube holds 0.349 ft³ per foot, which is about 0.61 bags of 80 lb concrete per foot. One tube with 4 ft of concrete needs 3 bags of 80 lb mix.
How much concrete is in a 10 inch Sonotube?
A 10 in tube holds 0.545 ft³ per foot. A 4 ft tube needs 4 bags of 80 lb concrete with 5% waste, and 11 tubes that size fit in 1 yd³.
How many Sonotubes does a yard of concrete fill?
One cubic yard fills 8 tubes that are 12 in wide with 4 ft of concrete each, or 11 tubes at 10 in, allowing 5% waste. A yard is 45 bags of 80 lb concrete.
How deep does a Sonotube need to go?
Deep enough that the footing sits below your local frost line, at the depth your plans and building department require. Then enter the full concrete height, buried part plus the part above grade. For the default six 12 in tubes, every extra foot of height adds about 8.2 bags of 80 lb mix.
Does the calculator include the footing under the tube?
No. It covers the round column only. Add a square footing pad with the footing shape in the concrete calculator, and use the maker's volume for a flared plastic base. The default six tubes alone take 0.73 yd³.
The formula, worked example and tables on this page are generated from the same calculation engine as the calculator, which is checked by automated reference tests. Last reviewed 20 November 2026 by the Solosoft team. Results are planning estimates, not engineering or code approval. See the calculation disclaimer.